Registering with MyAltro allows you to save all your favourite technical documents, blogs and videos in one place. Get access to exclusive content, additional technical support and more. Once you have submitted the registration form you will receive an email to verify your account. You will need to verify your account in order to log in, so follow the link in the verification email to complete this action.
When you set your password, it will need to be at least 8 characters including an upper case letter, a lower case letter, a number and a special character.
Log in or register for free samples and exclusive content
Can't see the region you're looking for? You can find a list of our global locations here
You are currently on the site for United Kingdom. We think you might be looking for the site for United States/Canada.
Madeleine House care home in Birmingham is a trusted provider of care for elderly people and offers support for people who have residential and dementia care needs. The Madeleine House team pride themselves on the quality of their catering, with their Chef Manager preparing meals daily from fresh, seasonal ingredients. The care home kitchen was in a poor state of repair and a full refurbishment was carried out, providing updated facilities.
As the care home catering team were operating out of a temporary kitchen in the car park, the kitchen refurbishment needed to be completed quickly, and with limited inconvenience and disruption to the staff and residents. After conversations with Altro’s specification consultant and recommendation from the installer, an adhesive-free safety floor was specified.
“Using an adhesive-free floor took away the chance of a poor installation and uneven finishes. It was a seamless process with the same product guarantees. Gutted I didn’t know about this product sooner to use on other previous projects.” Rick Bhatti, Property Delivery Surveyor, Anchor Care.
Altro Stronghold 30 adhesive-free in colour Tempest was installed in the commercial kitchen. Designed exclusively for commercial kitchens, Altro Stronghold 30 adhesive-free can be welded and walked on the same day, significantly reducing kitchen downtime. With an integral DPM, it’s fast-fitting and can even be installed over existing flooring or on fresh concrete with a maximum RH of 97%.
Sustainable and 100% recyclable Altro Stronghold 30 adhesive-free has been specifically designed for hard-working areas such as commercial kitchens. With an adhesive-free installation you can lay, weld and walk on the floor, on the same day, saving up to 50% installation time and reducing downtime for critical business areas.
Altro Stronghold 30 adhesive-free is the ideal flooring solution for busy kitchens. It’s easy to maintain and repair and has strong scratch and scuff resistance, giving your kitchen floor a longlife expectancy. It has Altro’s highest rating for slip resistance (PTV>55, R12) and 3mm thickness, which provides comfort underfoot and noise reduction up to 10dB.
Download the PDF to see products used in the photos and recommendations
Why would you pay more for adhesive, labour, and kitchen downtime when you could use adhesive-free which saves on all of these.
The flooring installation had been a one-day install rather than two days. It’s a faster, easier option to install, even when having to lay a new screed.